Week 1: 09.15.2011
Week 1: 09.15.2011
Photos are of beginning of the demolision process.
Drilling through concrete floor
Drilling through concrete floor  
 
Former 2nd floor breakroom floor is drilled through to prepare for cutting of the concrete.