Week 21: 01/17/2012
Week 21: 01/17/2012
 
 
 
 
 
 
 
 
 
 
 
 
The sheet rock is hung and the seams are bed and taped. The new walls are ready for texture and paint.
 
 
3rd floor: looking from elevator door toward storage room.